Case Ref
TD3107948
Country
South Africa
The installation of the AESSEAL® DMSF seal and SW2 water management system at the Ford plant in Pretoria, South Africa, has improved the MTBF of a crucial seal from less than two weeks to more than two years.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection

Related Case Studies

LabTecta puts a stop to eight-year oil leaks
AESSEAL solves reliability problem for US paper company
CURC solves leakage problem for Saudi company
RDSX the answer for Czech chemical company
CURC puts an end to leakage problem
Reliability Restored at Egyptian Sugar Refinery
Dual seal cuts costs for UAE company
DMSF seal saves thousands for Australian company