![](https://static.aesseal.com/content-image/cases/TD3109292.jpg)
Case Ref
TD3109292
Country
Belgium
Lack of cooling with the existing system, improper installation and faulty alignment was causing a seal at a biofuel plant in Belgium to fail every one to two weeks, and sometimes after as little as one day.
More Industry Related Content