Case Ref
TD307978
Country
United States

High levels of water consumption were causing growing concern at a US recycle paper mill. Water from the local public utility was being used as a flush on single seals at a rate of 720 gallons a day per pump, resulting in high water bills and a heavy cost from evaporation.