A UK based Oil Refinery was having repeated failures on a Coppus 24 Steam Turbine. The original OEM labyrinth seal was ineffective at sealing the bearing housing from the ingress of steam, leading to premature bearing failure.

Case Ref
CH01224
Country
United Kingdom

Related Products

For Steam Turbine Applications