Case Ref
TD3115391
Country
United Arab Emirates
A petrochemical company in the Middle East was having problems with the persistent failure of back-to-back seals in a propane mixture pump.

More Industry Related Content

Related Products Pages

Dual Mechanical Seal – Oil & Gas

Related Case Studies

Cleaner plant with AESSEAL gland packing
LabTecta puts a stop to eight-year oil leaks
Reliability upgrade saves $24k per year
El nivel de servicio convierte a AESSEAL® en el claro ganador
$10,500 yearly cost saving for Chemical manufacturer
Improved reliability with AESSEAL packing system
Chemical Producer Saves Over £1.7 Million in Plant Downtime
7 years trouble free bearing protection