Case Ref
TD3107678
Country
Sweden
A pulp and paper company in Sweden was having problems with the persistent failure of the seal on a hot boiler application. Ineffective cooling of the sealing water and the inability of the elastomers to cope with the high temperatures meant that the seal was failing every three to four months.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Water Management Systems

Related Case Studies

Paper producer saves more than one million Dollars per year
Preventing toxic leakage and improving reliability
CDSA provides major savings for German company
Bearings saved with LabTecta bearing protector
CDM reliability the answer for seal failures
LabTecta upgrade increases MTBF from 2 weeks to 2 years and counting
AESSEAL cools the temperature at Canadian paper mill
FIDC ends costly leaks at US firm