Case Ref
TD3082094
Country
Namibia

A mining company in Namibia was experiencing persistently low pressure in its gland service water system. This was causing excessive wear on the shaft sleeves, which were having to be changed two or three times each month, and meant that the slurry pump had to be taken offline, isolated and stripped in order to replace the shaft sleeve and gland packing.

More Industry Related Content

Related Products Pages

Medium to Heavy-Duty Double Slurry Seal
Water Management Systems
Fluid Distribution Unit

Related Case Studies

DMSF seal saves thousands for Australian company
Upgrade eliminates environmental impact and delivers a 833% MTBF improvement
AVT sensors save thousands for US company
Replacing gland packing reduces cost, and improves reliability
Reliability upgrade saves over ZAR200,000 in just 10 months of operation
CDPH brings big savings for Botswana company
Los sensores AVT ahorran miles de dólares a una empresa estadounidense
Mining company saves $8 million AUD with AESSEAL system