A bitumen pump that produces tarmac for road surfaces was gland packed and losing over 15 tonnes of bitumen before the packing was replaced every 6 months.
Case Ref
c
Country
United Kingdom
For information on our privacy practices and commitment to protecting your privacy, check out our Privacy Policy.