A bitumen pump that produces tarmac for road surfaces was gland packed and losing over 15 tonnes of bitumen before the packing was replaced every 6 months.

Case Ref
c
Country
United Kingdom

Related Products

Bellows Single Full Graphite Cartridge Seal