A critical glue agitator vessel was affecting productivity for a silicone manufacturing facility in France. The installed mechanical seal was had a life of between 4 and 8 weeks, and replacement required the agitator to be off-line for 7 days. This situation was costing the company thousands of Euros in lost production.

May case study of the month shows how AESSEAL helped a customer facing a week’s lost production every couple of months because excessive radial movement in a mixer paddle shaft was causing seal failure.

More Industry Related Content

Related Products Pages

Canister Double Monolithic Stationary Convection
Gas Pressurised / Buffer Systems

Related Case Studies

FDGS improves safety and reliability at Spanish company
Major reliability improvement with CSSN seals
Cleaner plant with AESSEAL gland packing
Reduce maintenance costs with reliability upgrade
Improved reliability with AESSEAL packing system
Quality of service key to AESSEAL contract
CURC solves reliability problem for SA company
Upgrade will result in major savings for US company