Case Ref
TD3111727
Country
Saudi Arabia
The split seal on a transfer pump at a wastewater plant in Saudi Arabia was leaking so badly that sewage was flooding the pumping room. The failures were occurring at less than six-monthly intervals, which the company found unacceptable.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Water Management Systems

Related Case Studies

LabTecta puts a stop to eight-year oil leaks
AESSEAL solves reliability problem for US paper company
CURC solves leakage problem for Saudi company
RDSX the answer for Czech chemical company
CURC puts an end to leakage problem
Reliability Restored at Egyptian Sugar Refinery
Dual seal cuts costs for UAE company
DMSF seal saves thousands for Australian company