Case Ref
TD3111727
Country
Saudi Arabia
The split seal on a transfer pump at a wastewater plant in Saudi Arabia was leaking so badly that sewage was flooding the pumping room. The failures were occurring at less than six-monthly intervals, which the company found unacceptable.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Water Management Systems

Related Case Studies

AESSEAL product solves reliability problem
AESSEAL cures reliability issues at US wastewater facility
Enormes ahorros tras la instalación de LabTecta
LabTecta saving time and money at US plant
Huge savings after LabTecta installation
AESSEAL CURC stops leaks at sewage treatment plant
LabTecta IAP solves ash dust problem
Una empresa consigue un gran ahorro con el sistema AESSEAL