Case Ref
TD3111727
Country
Saudi Arabia
The split seal on a transfer pump at a wastewater plant in Saudi Arabia was leaking so badly that sewage was flooding the pumping room. The failures were occurring at less than six-monthly intervals, which the company found unacceptable.

More Industry Related Content

Related Products Pages

Double Monolithic Stationary Flow / Convection
Water Management Systems

Related Case Studies

AESSEAL cures reliability issues at US wastewater facility
Improved reliability for Flygt pump
Major savings with CKD double seal
Huge savings after LabTecta installation
Una empresa consigue un gran ahorro con el sistema AESSEAL
LabTecta IAP solves ash dust problem
Helping to keep the water flowing for South Australia
Enormes ahorros tras la instalación de LabTecta