Case Ref
CS0052
Country
South Africa

A copper, zinc and lead mine in South Africa was experiencing reliability issues with three of their mine de-watering pumps.

More Industry Related Content

More API Related Content

Related Products Pages

Single Cartridge Seal
Adjustable Flow Meter
Fluid Distribution Unit

Related Case Studies

AESSEAL system eases cost pressures for African company
Safety and reliability with AESSEAL heavy duty seal
Improved safety and production efficiency while reducing water consumption
CDPH brings big savings for Botswana company
ZAR84,000 Saving with reliability upgrade from packing
Mining company saves $8 million AUD with AESSEAL system
Upgrade eliminates environmental impact and delivers a 833% MTBF improvement
Huge cost savings and improved reliability with gland packing upgrade