Case Ref
CH00704 - CH00706
Country
Australia

A coal mine in Australia was using gland packing on 3 coal slurry transfer pumps. The gland packing would start to fail after 6 weeks and the yearly maintenance bill for the 3 pumps was over $135,000AUD.

More Industry Related Content

Related Products Pages

Heavy Duty Slurry Seals
Water Management Systems

Related Case Studies

80 million litres of water per year to be saved at Mexican mine
Huge water savings for uranium mine
Improved reliability with reduced water cost
Reliability upgrade saves over ZAR200,000 in just 10 months of operation
AESSEAL system eases cost pressures for African company
Five times improvement in reliability
Safety and reliability with AESSEAL heavy duty seal
Los sensores AVT ahorran miles de dólares a una empresa estadounidense