Case Ref
CH00704 - CH00706
Country
Australia

A coal mine in Australia was using gland packing on 3 coal slurry transfer pumps. The gland packing would start to fail after 6 weeks and the yearly maintenance bill for the 3 pumps was over $135,000AUD.

More Industry Related Content

Related Products Pages

Heavy Duty Slurry Seals
Water Management Systems

Related Case Studies

80 million litres of water per year to be saved at Mexican mine
AESSEAL system eases cost pressures for African company
Upgrade eliminates environmental impact and delivers a 833% MTBF improvement
Mechanical Seal upgrade improve reliability and saves more than ZAR 580,000
Seguridad y fiabilidad con el sello de alta resistencia AESSEAL
5 years without failure and a ZAR3.2million saving
DMSF seal saves thousands for Australian company
CDPH brings big savings for Botswana company