Caso Práctico TD3103147_ES
Case Ref
TD3103147_ES
Country
Australia

Una empresa minera de Australia se enfrentaba a problemas persistentes debido a fallos en las sellos de una de sus bombas de lodos.

More Industry Related Content

Páginas de productos relacionados

Sistemas de gestión del agua

Related Case Studies

ZAR84,000 Saving with reliability upgrade from packing
Increased MTBF by more than 700%
80 million litres of water per year to be saved at Mexican mine
CDPH brings big savings for Botswana company
Saving over 1 billion gallons of water
Reduced maintenance and water consumption at Iron Ore Mine
Improved safety and production efficiency while reducing water consumption
Major savings for SA company