Featured Case Studies
The case studies below showcase the very best of commitment to excellence at AESSEAL across our three core pillars:
- Exceptional Customer Service – putting customers first, every time.
- Advanced Technology – delivering innovation that drives results.
- Sustainable Solutions – engineering a better future for people and our planet.
AESSEAL product brings big savings for South African company
Chemical plant saved over €500,000 in the first year
AESSEAL system fixes sewage problems for US township
A municipality in Pennsylvania was having issues with major inefficiencies in its sewage treatment system.
AESSEAL product ends emissions penalties for Polish company
DMSF solves reliability issues for Swedish company
AESSEAL packing system brings major savings
A French pharmaceuticals company has saved over €200,000 in the first year following its decision to change to an AESSEAL reactor packing system.
CFFC™ solves reliability problem on North Sea oil platform
LabTecta ends dust pollution problem for SA firm
Preventing dust from escaping into the working environment and is saving thousands of dollars a year
Major savings follow change to AESSEAL FIDC™
Major savings with CKD double seal
LabTecta ends contamination problem at Australian mining company
CDSA seals brings huge savings for US company
AESSEAL product removes risk of HFC emissions
80 million litres of water per year to be saved at Mexican mine
Staying cool in Cardiff
Mining company saves $8 million AUD with AESSEAL system
Major reliability improvement with CSSN seals
DMSF seal the answer at South African plant
Bitumen pump upgrade saves over £23,000 a year
Asphalt producer pump for road surfaces was gland packed and losing over 15 tonnes of bitumen.
DMSF makes its mark in Japanese paper industry
Exceptional service saves thousands in lost revenue
AESSEAL were contacted by a power plant in the UK who were experiencing a major issue with their supply of mechanical seals.
Prompt delivery saves three-month delay
Rapid response impresses Saudi customer
Sourced and supplied a replacement seal in just two weeks for customer’s Oil and Gas operation in Saudi Arabi
LabTecta FS the answer for gearbox problem
ROI In Less Than A Month
Change to packing saves Swiss company $millions
A chocolate producer in Switzerland has saved around ₣2.3 million ($2.6 million) over the past year following its decision to change to an AESSEAL pump packing system.
FIDC ends costly leaks at US firm
LabTecta IAP solves ash dust problem
Leakage problem solved with STS & ST
CDPH & EasyClean boosts MTBF from four months to seven years
Major savings follow installation of AESSEAL product
A petrochemical company based in the Middle East was having problems with persistent and costly seal failures.